GAMA - home About Us Projects Achiievements Affiliates Contact Us
 

 
:: Completed Industrial Projects in Saudi Arabia ::

:: Ongoing Industrial Projects in Saudi Arabia ::


QATIF Facilities at Berri Gas Plant Civil & Mechanical Works
OWNER - Saudi ARAMCO - YEAR - 2005
CLIENT - Technip Saudi Arabia Ltd. (TPSA)
Major Bill of Quantities :
- Excavation: 127,822 m3
- Concrete: 21,118 m3
- Reinforcement: 2,123 tons
- U/G Piping: 56,431 m
- Structural Steel Works: 6,918 tons
- Mechanical Works: 10,101 tons
- Piping Works: 9,692 tons
- Insulation: 96,500 m2
- Painting: 89,000 m2



 


EPCC Cement Plant New Clinker Production Line Project
OWNER - Eastern Province Cement Co. of KSA - YEAR - 2005
CLIENT -
Gama Arabia / Polysius AG - Germany & ABB - Switzerland
a) Detail design of the Civil and Structural Steel Works
b) Civil Construction
- 33,700 m3 Excavation,
- 29,100 m3 Backfilling,
- 8,760 m2 Soil Compaction
- 37,400 m3 Concrete works,
- 4,250 tons reinforcing bars,
- 36,700 m2 formworks,
- 20,200 m2 sliding formworks
- 12,800 m2 roads and pavement
c) Manufacturing and Erection
- 4,070 tons steel manufacturing and erection and painting
- 7,880 m2 platform covering,
- 8,200 m2 building cladding,
- 9,010 tons mechanical, refractory and insulation erection works
- 350 km cable erection works,
- 5,350 equipment, instrument, device erection and termination works
d) Workmanship of Commissioning




 


SAFCO IV- Ammonia/Urea  Project
OWNER - SABIC (Saudi Fertilizer Company) - YEAR - 2004
CLIENT - UHDE Arabia Ltd.
Civil and Underground Works
199,304 m3 Excavation
54,192 m3 Concrete
14,900 mT Reinforcement
9,327 m Underground Piping
6,804m Underground Conduit
 



PETROKEMYA - Polyethylene Plant Project
OWNER - SABIC (PETROKEMYA)- YEAR - 2001
CLIENT -
SATEC Saudi Toyo Engineering Company
Complete Turnkey Civil, Mechanical, Electrical and Instrumentation Works of the plant.
a) Civil/Building/Structure
- Excavation 89,500 m3,
- Concrete 32,000 m3,
- Steel Erection 5,513 tons,
b) Equipment Erection 3,732 tons
c) Piping Works
- A/G metal 277,000 wdi,
- U/G FRP 20,000 wdi
d) Electrical Works
- Cable/Wire 303,000 lm,
- Rack/tray 1,330 lm
e) Instrumentation Works
- Instrument 1,222 nos,
- Cable/Wire 234,000 lm,
- Pipe/Tubing 2,050 lm
f) Insulation 11,700 m2
g) Painting 117,000 m2
h) Process Control Building 1,400 m2
i) Substation No.18 1,030 m2
j) Substation No.19 400 m2
k) EG Building 50 m2




HAWIYAH
GAS PLANT SULFUR RECOVERY UNIT Project

OWNER -
Saudi Arabian Oil Company (Saudi Aramco)
YEAR - 1999
CLIENT - Technip Italy S.p.A.
Complete Civil and Mechanical works
a) Civil Works
- Site Preparation : 40,000 m2
- Excavation & Backfilling : 300,000 m3
- Asphalt Paving : 200,000 m2
- RTR Piping (4" to 3" ) : 30 km
- Concrete : 25,000 m3
- Formwork 80,000 m2
- Rebar : 2,500 ton
- Buildings (23 nos.) : 6000 m2
b) Mechanical Erection
- Equipment Works : 7,400 tons
- Piping Works : 3,850 tons
- Steel Works : 3,500 tons
- Painting Works : 50,000 m2
- Insulation Works : 40,000 m2
- Refactory Works : 745 m3





SHOAIBA - POWER PLANT Project Stage I
YEAR - 1999
OWNER
- SCECO, Western Region
CLIENT - ALSTOM Power Italia S.p.A.
Complete erection of 5x367MW Boiler Units.
a) Mechanical Erection Works
- Steel Structure : 11,425 Tons
- Pressure Parts : 13,130 Tons
- Ljungstrom Air Preheater : 3,380 Tons
- Air & Gas Ducts : 3,915 Tons
- Electro Static Precipitator : 5,325 Tons
- Equipment & Piping : 3,000 Tons
b) Above Ground Piping Works
- Prefabrication & Erection : 461,281 WDI
c) Equipment Erection : 5,875 Tons
d) Electrical & Instrumentation Works of Boiler Package




CAUSTIC SODA - Prilling Plant Project
YEAR - 1995
OWNER -
Arabian Industrial Development Co. (NAMA)
CLIENT - Mitsui Engineering & Shipbuilding Arabia Ltd.
a) Supply and civil construction, including:
269 ea bored piles, 1,057 m2 vibroflotation, 3,050 m3 structural concrete, 11,500 m2 formwork, 450 tons rebar,
b) Mechanical erection works, including:
780 tons structural steel (supply, fabrication), 133 tons piping (21,000 WDI), 8 km of 4" stainless steel pipeline, 420 tons equipment/vessel,
18,000 m2 sandblasting & painting,
c) Electrical installation works, including;
11,000 m conduits, 1,000 m cable trays, 54,000 m cables, 200 ea panels,
d) Instrumentation installation, including;
4,000 m conduits, 350 m cable trays, 14,000 m cables, 750 m tubings,
700 pcs instruments,
e) Start-up and commissioning activities.





IBN ZAHR POLYPROPYLENE II PROJECT
Mechanical works - - YEAR - 1999
OWNER - IBN ZAHR (SABIC).
CLIENT - Saudi Arabian Parsons Ltd.
Piping Works (170,000 wdi, 66,000 lm, 1,800 tons)
Steel Structure Erection (3,400 tons)
Equipment Erection (3,400 tons)
Internal Mechanical & Chemical Cleaning (15,000 lm)
Painting (47,000 lm)
Installation of Mechanical Utilities (HVAC, Fire Fighting, Plumbing, etc.) including material supply (6 bldg)
Civil/Architectural Works including material supply (6 bldg.)
Fire proofing including material supply (3,300 m2)
Insulation including material supply (11,500 lm piping, 4,500 m2 equip.)
Tie-ins (101 ea.)
Trays & Packings (6 vessels)
Commissioning Assistance.




 

NAMA EPOXY - RESIN PLANT
YEAR - 1997
OWNER
- Arabian Industrial Development Company (NAMA)
CLIENT - Mitsui Shipbuilding & Engineering Co.
a) Supply and civil construction, including:
Site clearance, earthworks and piling, 11,250 m3 of reinforced structural concrete, 23,000 m2 formwork,
b) Design, supply and construction of 9,000 m2 closed plant buildings.
c) Mechanical erection works, including:
600 tons of piping prefabrication and erection (97,500 WDI),
1,100 tons of structural steel (fabrication and erection),
900 tons of various equipment, vessels, heat exchanger,
22 km of 4" carbon steel product pipeline from port to site,
4 km of 8" carbon steel pipeline inside the port area,
d) Complete electrical and instrumentation erection works, including;
39,000 m conduits, 3,400 m cable trays, 167,500 m cables,
197 pieces of various electrical panels, 4,500 m instrument tubing,
1,300 pieces of instruments, including calibration.
e) 37,000 m2 surface painting of structural steel, piping and various equipment.
f) Start-up and commissioning activities.
 


HADEED - DR MODULE "D" Project
YEAR - 1997
OWNER - Saudi Iron & Steel Company (HADEED)
CLIENT - Saudi Davy Company Ltd. (KVAERNER DAVY)
a) Mechanical erection works, including;
4,400 tons structural steel
750 tons piping prefabrication & erection (98,000 WDI)
7,920 tons equipment/vessel
Various heavy equipment, including heavy a 420 tons Reactor Vessel lifted to +41.0 m elevation.
18,100 m2 sandblasting & painting
16,650 m2 roof and wall cladding
b) complete instrumentation installation, including;
4,004 pcs of instruments including calibration
6,774 m instrument tubing
704 pcs hook-up installation
c) Start-up and commissioning assistance




PETROKEMYA OLEFINS PROJECT - U&YO
YEAR - 1
992
OWNER - Arabian Petrochemical Company (Petrokemya).
CLIENT - Mitsui Shipbuilding & Engineering Co.
a) Supply and civil construction works, including:
18,000 m3 excavation, 2,300 m3 reinforced structural concrete,
9,000 m2 formwork, 190 tons reinforcing bar, miscellaneous civil works.
b) Mechanical erection works, including:
380 tons steel structure, 420 tons mechanical equipment,
700 tons process piping, 28 km of 6" and 13 km of 4" pipelines.
c) Complete electrical equipment and instrumentation works, including 66,500 m of cabling.
d) 22,000 m2 of sandblasting and painting.
e) Start up and commissioning.

 


PETROKEMYA Olefins Project - CSA-2 Package
YEAR - 1991
OWNER -
Arabian Petrochemical Company (Petrokemya) / S.Arabia.
CLIENT - Mitsui Engineering and Shipbuilding Arabia Ltd.
Gama was responsible for the supply and construction of civil, structural and architectural works, including;
100,000 m3 excavation,
20,000 m3 reinforced structural concrete,
40,000 m2 formwork,
1,700 tons of epoxy coated reinforcing bar,
40,000 m2 epoxy lining of residue evaporation ponds,
Erection of 1,000 tons of steel structure,
100,000 m2 asphalting for roads, paving and outside area,
1,200 m2 building including HVAC and electrical system installations.

 


YAMAMA - Cement Plant
YEAR - 1984
OWNER - Yamama Saudi Cement Company Ltd. / Saudi Arabia
CLIENT - Krupp Polysius A.G. / Germany
a) Mechanical erection, including;
9,000 tons of mechanical equipment (conveyors, crushers, mills, kiln, electroprecipitators, ducts, chutes, etc.)
1,000 tons of piping,
2,200 tons of refractory.
b) High and low voltage electrical erection including 1,000 km of cables, electrical motors, MCC panels, lighting systems, instrumentation and controls.
c) 130,000 m2 surface painting.
d) 32,000 m2 heat insulation.
e) Start up and commissioning activities.


SAKUFA - Cement Plant
YEAR - 1982
OWNER
- Saudi - Kuwaiti Cement Manufacturing Company (SKC) / Saudi Arabia
CLIEN
T - Krupp Polysius A.G. / Germany
a) Complete mechanical erection, including;
15,000 tons of mechanical equipment,
3,000 tons of structural steel,
4,500 tons of refractory,
1,300 tons of piping.
b) Installation of complete high-and low-voltage electrical system and automatic controls, including; 850 km cable, 5,000 tons of electrical equipment and instrumentation.
c) 320,000 m2 of surface painting
d) 19,000 m2 of heat insulation
e) Start-up and commissioning activities.






TASNEE Petrochemicals HDPE/LDPE Units Construction Works
YEAR - 2006
OWNER
- TASNEE Petrochemicals
CLIEN
T - TECNIMONT
LOCATION - Jubail
ESTIMATED COMPLETION - June 2008
Full Civil and Mechanical Installation Contract






PETRORABIGH PC1 PE Development Project
YEAR - 2006
OWNER
- Saudi ARAMCO & SUMITOMO J.V.
CLIEN
T - TECNIMONT
LOCATION - Rabigh
ESTIMATED COMPLETION - June 2008
Full Civil and Mechanical Installation Contract






SIEMENS A.G. SHOAIBA IWPP Boiler Erection Works
YEAR - 2006
OWNER
- SIEMENS GMBH
CLIEN
T - ANSALDO CALDIE Italy
LOCATION - Jeddah
ESTIMATED COMPLETION - April 2009
Full Civil and Mechanical Installation Contract


Rabigh Cement Plant Extension Line 6
YEAR - 2005
OWNER
- Arabian Cement Company
CLIEN
T - Polysius AG - Germany
ESTIMATED COMPLETION - February 2008
Full Civil and Mechanical Installation Contract, Civil and Steel Detailed Design, Supply and Fabrication of Steel Structures, Cold Run Tests.






Construction of GTC Plant Facilities for Hawiyah HNRP Program
YEAR - 2005
OWNER
- Saudi ARAMCO
CLIEN
T - Snamprogetti Italy
LOCATION - Hawiyah
ESTIMATED COMPLETION - December 2007
Full Mechanical Installation Contract






National Petrochemicals Industrial Company (NATPET) - Polypropylene Plant Project
YEAR - 2005
OWNER
- NATPET
CLIEN
T - TECNIMONT
LOCATION - Yanbu
ESTIMATED COMPLETION - July 2007
Full Civil and Mechanical Installation Contract






6X380 MW SHOAIBA Power Plant Phase II Stage II Installation Works
YEAR - 2004
OWNER
- SCECO
CLIEN
T - ALSTOM POWER Inc.
LOCATION - JEDDAH
ESTIMATED COMPLETION - July 2007
Full Mechanical Installation Contract






YAMAMA Cement Plant - Construction of New Cement Plant No:7 and Cement Mill No:6
YEAR - 2004
OWNER
- YAMAMA Saudi Cement Company
CLIEN
T - YAMAMA Saudi Cement Company
LOCATION - Riyadh
ESTIMATED COMPLETION - April 2007
Full Civil, Mechanical, Electrical and Instrumental Installation and Detailed Design Contract. Full Supply of Steel Structures.






© 2003 GAMA - .:: Gama Al Moushegah Arabia Ltd. ::..